Which one of the following statements about the Suez Canal is not correct?

This question was previously asked in
NDA (Held On: 17 Nov 2019) General Ability Test Previous Year paper
View all NDA Papers >
  1. The Suez Canal was constructed in 1869
  2. It links the Mediterranean Sea and the Red Sea
  3. It has a six lock system and ships cross the different levels through these locks
  4. It has given Europe a new gateway to the Indian Ocean

Answer (Detailed Solution Below)

Option 3 : It has a six lock system and ships cross the different levels through these locks
Free
NDA 01/2025: English Subject Test
5.5 K Users
30 Questions 120 Marks 30 Mins

Detailed Solution

Download Solution PDF

Suez Canal is a sea-level waterway that runs across the Egyptian Isthmus of Suez to connect the Red sea and Mediterrranean sea.

  • The Suez Canal was completely built by 1869.
  • The Suez Canal is an open cut, without locks. Hence, the third statement is incorrect and hence the correct answer.
  • The Canal is responsible for providing Europe with a new gateway to the Indian Ocean, as well as the Western Pacific Oceans.
Latest NDA Updates

Last updated on Jun 18, 2025

->UPSC has extended the UPSC NDA 2 Registration Date till 20th June 2025.

-> A total of 406 vacancies have been announced for NDA 2 Exam 2025.

->The NDA exam date 2025 has been announced. The written examination will be held on 14th September 2025.

-> The selection process for the NDA exam includes a Written Exam and SSB Interview.

-> Candidates who get successful selection under UPSC NDA will get a salary range between Rs. 15,600 to Rs. 39,100. 

-> Candidates must go through the NDA previous year question paper. Attempting the NDA mock test is also essential. 

More World Economic and Human Geography Questions

Get Free Access Now
Hot Links: all teen patti master teen patti all teen patti all app teen patti master 51 bonus