In PERT chart, the activity time distribution is

  1. Normal
  2. Binomial
  3. Poisson
  4. Random
  5. Beta

Answer (Detailed Solution Below)

Option 5 : Beta
Free
Rajasthan RSEB JEN (RVUNL) Electrical - Mini Mock Test
4.8 K Users
70 Questions 100 Marks 60 Mins

Detailed Solution

Download Solution PDF

Explanation:

CPM does not directly model uncertainty.

PERT was developed to address the needs of projects which are being done for the first time – a challenge to estimate activity duration.

PERT (Program Evaluation and Review Technique) uses 3 cases:

  • Most Optimistic
  • Most Pessimistic
  • Most likely durations

 

PERT determines the probability for each duration, whereas CPM considers the most likely duration.

In the standard PERT analysis, the distribution assumed for the activity times is a Beta distribution.

F1 S.S. N.J 19.07.19 D 8

F1 S.S. N.J 19.07.19 D 9

Latest RVUNL JEN Updates

Last updated on Apr 16, 2025

-> RVUNL JE Result 2025 out! Candidates can check their result on official website @rrvunl.exam.in. 

-> Candidates who have cleared cut off will be called for Document Verification.

-> RVUNL JEN Exam was conducted on 11th and 12th April 2025 for Junior Engineer and Junior Chemist posts.

-> The RVUNL JEN Notification 2025 was released for 228 vacancies.

-> The application process was started on 30th January 2025 and ended on 20th February 2025.

-> Engineering graduates, between 21 to 43 years of age can apply for the RVUNL JE Recruitment.

-> The selection process includes a written test and document verification.

More Operations Research Questions

Get Free Access Now
Hot Links: teen patti master plus real cash teen patti teen patti master 2024 teen patti joy vip teen patti sweet