Question
Download Solution PDFA river training work is generally required when the river is
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFExplanation:
River Training Works
River training works are constructed for several reasons but the fundamental objective is to restrict the horizontal movement of the river channel along a certain alignment.
The measures are adopted to train the river because rivers in alluvial flood plains are prone to meandering and hence cause a lot of damage to life and property.
Additional InformationMeandering
- Meandering is considered a wave phenomenon.
- A meander is formed when moving water in a stream erodes the outer banks and widens its valley and the inner part of the river has less energy and deposits what it is carrying.
- A meandering channel tends to be deeper towards the concave bank and progressively gets shallower towards the convex bank.
Last updated on Jun 4, 2025
-> BPSC AE 2025 exam date has been revised. The exam will be conducted on July 5, 6 & 7 now.
-> Candidates who were facing technical issues while filling form can now fill the BPSC AE application form 2025 without any issue.
->BPSC AE age limit 2025 has been revised.
->BPSC AE application form 2025 was released on April 30. The last date to fill BPSC AE form 2025 was May 28.
->BPSC AE interview call letters released for Advt. 32/2024.
->BPSC AE notification 2025 has been released.
->A total of 1024 vacancies are announced through BPSC AE recruitment 2025
->The BPSC Exam Calendar 2025 has been released for the Assistant Engineer Recruitment.
-> The selection will be based on a written exam and evaluation of work experience.
-> Candidates with a graduation in the concerned engineering stream are eligible for this post.
-> To prepare for the exam solve BPSC AE Previous Year Papers. Also, attempt the BPSC AE Civil Mock Tests.