Question
Download Solution PDFWith reference to power generation, the initial cost of _______ power plant is highest and the running cost of _______ power plant is lowest.
This question was previously asked in
MPPGCL JE Electrical 28 April 2023 Shift 2 Official Paper
Answer (Detailed Solution Below)
Option 1 : nuclear, hydroelectric
Free Tests
View all Free tests >
MPPGCL JE Electrical Full Test 1
3.9 K Users
100 Questions
100 Marks
120 Mins
Detailed Solution
Download Solution PDFExplanation
Initial Cost:
- Nuclear power plants have the highest initial cost due to expensive construction, safety measures, and regulatory requirements.
Running Cost:
- Hydroelectric power plants have the lowest running cost since they utilize the natural flow of water, requiring minimal fuel or operational expenses.
Comparison between different power plants:
Last updated on May 29, 2025
-> MPPGCL Junior Engineer result PDF has been released at the offiical website.
-> The MPPGCL Junior Engineer Exam Date has been announced.
-> The MPPGCL Junior Engineer Notification was released for 284 vacancies.
-> Candidates can apply online from 23rd December 2024 to 24th January 2025.
-> The selection process includes a Computer Based Test and Document Verification.
-> Candidates can check the MPPGCL JE Previous Year Papers which helps to understand the difficulty level of the exam.