Question
Download Solution PDFIndia will have its bullet train with the help of _________
This question was previously asked in
Maha TAIT Official Paper (Held On 12 Dec 2017 Shift 2)
Answer (Detailed Solution Below)
Option 1 : Japan
Free Tests
View all Free tests >
MAHA TAIT Reasoning Intelligence (बुद्धिमत्ता) Sectional Test 1
7.9 K Users
30 Questions
30 Marks
20 Mins
Detailed Solution
Download Solution PDFThe correct answer is Japan.
Key Points
- India's first bullet train will run in the Mumbai and Ahmedabad high-speed rail corridor, whose construction began in September 2017.
- It is a 508 km long high-speed rail corridor built with the help of Japan.
Important Points
- India's first bullet station- Surat
- This Surat station will be the first station in India to be built between the Ahmedabad-Mumbai Bullet Train Route (MAHSR).
- The MAHSR corridor will consist of 12 stations namely Surat, Vadodara, Anand, Ahmedabad, Sabarmati, Bilimora, Bharuch, Mumbai, Thane, Virar, Boisar, Vapi stations.
Last updated on May 26, 2025
-> The MAHA TAIT Admit Card 2025 has been released on its official website.
-> The MAHA TAIT 2025 will be conducted from 27th to 30th of May 2025 abd from 2nd to 5th of June 2025.
-> The minimum educational qualification required for the Maharashtra Teaching Aptitude Test is a graduation degree from a recognized university.
-> To practice and prepare well for the MAHA TAIT 2025, solve the MAHA TAIT Previous Years' Papers for free.