Question
Download Solution PDFAn activity requires
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFExplanation:
Activity:
- Every project consists of a number of job operations or tasks which are called activities.
- An arrow is used to depict an activity with its head indicating the direction of progress in the project.
- Activity consumes time and resources.
- An activity may be performed by an individual or a group of individuals.
- When two activities start at the same instant of time the head events are joined by a dotted arrow, and this is known as dummy activity.
- The dummy activity does not consume time and resources.
Additional Information
Event:
- The event is a specific instant of time that makes the start and the end of an activity.
- The event consumes neither time nor resources.
- It is represented by a circle, and the event number is written within the circle.
Last updated on Jun 23, 2025
-> JKSSB JE application form correction facility has been started. Candidates can make corrections in the JKSSB recruitment 2025 form from June 23 to 27.
-> JKSSB Junior Engineer recruitment exam date 2025 for Civil and Electrical Engineering has been released on its official website.
-> JKSSB JE exam will be conducted on 10th August (Civil), and on 27th July 2025 (Electrical).
-> JKSSB JE recruitment 2025 notification has been released for Civil Engineering.
-> A total of 508 vacancies has been announced for JKSSB JE Civil Engineering recruitment 2025.
-> JKSSB JE Online Application form will be activated from 18th May 2025 to 16th June 2025
-> Candidates who are preparing for the exam can access the JKSSB JE syllabus PDF from official website of JKSSB.
-> The candidates can check the JKSSB JE Previous Year Papers to understand the difficulty level of the exam.
-> Candidates also attempt the JKSSB JE Mock Test which gives you an experience of the actual exam.