A machine table is lifted by means of a double start screw thread which had a pitch of 5 mm. How many revolutions are needed to lift the table to a height of 200 mm?

This question was previously asked in
ISRO SHAR Technician B Fitter 29 April 2018 Official Paper
View all ISRO Technician B Fitter Papers >
  1. 20 revolutions
  2. 40 revolutions
  3. 10 revolutions
  4. None of the above

Answer (Detailed Solution Below)

Option 1 : 20 revolutions
Free
ISRO Technician B: Fitter Full Test 1
16.8 K Users
60 Questions 180 Marks 90 Mins

Detailed Solution

Download Solution PDF

Explanation:

Concept:

Double start screw thread:

  • In the double start thread, one thread is wound exactly in the middle of the other.
  • This made it possible to raise the lead of the helix without raising the pitch.
  • The relation between lead and pitch is given as:

Lead (L) = pitch (p) × number of start (n)

qImage633

Calculation:

Given:

Pitch (p) = 5 mm, lift (L) = 200 mm, type of thread = double start

So, for one revolution, the screw advance = 2 × p = 2 × 5 = 10 mm

Number of revolutions = \(\frac{Total\space screw\space advance}{Screw\space advance\space in\space one\space revolution}\) = \(\frac{200}{10}\) = 20 revolutions

Thus, option (1) is the correct answer.

Latest ISRO Technician B Fitter Updates

Last updated on May 28, 2025

-> ISRO Technician Fitter recruitment notification 2025 has been released

->Candidates can fill ISRO Fitter application form from June 2 to 16. 

->A total of 20 vacancies are announced for ISRO recruitment 2025 for Fitter.

->Candidates must have passed SSLC/ SSC/ Matriculation and should have NTC/ITI/NAC in ->Fitter Trade Certificate from an NCVT recognized by the government to satisfy the ISRO Technician B Fitter Eligibility Criteria.

Get Free Access Now
Hot Links: teen patti royal teen patti all games teen patti gold old version